0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Rehabilitation of the Outeiro Bridge with emergency strengthening of the superstructure damaged by barges impact

 Rehabilitation of the Outeiro Bridge with emergency strengthening of the superstructure damaged by barges impact
Author(s): , , ,
Presented at IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024, published in , pp. 182-189
DOI: 10.2749/manchester.2024.0182
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.11 MB

The collapse of one of the supports of the central section of the bridge compromised the overall stability of the deck, leading to the immediate shutdown of its operation on January 16, 2022. There...
Read more

Bibliographic Details

Author(s): (Dr. Civil Engineering, Structures, Professor of the Polytechnic School of USP, CEO of LSE)
(Secretary of State for Transport of Pará - SETRAN)
(Secretary of State for Transport of Pará - SETRAN)
(Technological Research Institute – IPT, Engineer Civil of LSE Infra)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024
Published in:
Page(s): 182-189 Total no. of pages: 8
Page(s): 182-189
Total no. of pages: 8
DOI: 10.2749/manchester.2024.0182
Abstract:

The collapse of one of the supports of the central section of the bridge compromised the overall stability of the deck, leading to the immediate shutdown of its operation on January 16, 2022. Therefore, the occurrence of the collapse of the AP4 support after 37 years of operation led to the immediate isolation of the population of Outeiro Island, which today has 80,000 inhabitants, who use the bridge daily, with a volume of motor vehicles in the order of 4,500 per day. Therefore, as a premise, both the emergency strengthening and retrofitting of the Outeiro I Bridge were carried out with the partial operation. Considered an urban bridge over the Maguary Canal where there are large shipyards and docking ports for barges convoy that transit on the Belém-Manaus waterway route, the solution considered the duplication of the navigation channel with the construction of the cable-stayed bridge on the central section, making it safe for both heavy vehicle traffic and navigation with 2 navigation channels with a width of 80m and 100m and 12m height.

Keywords:
Evaluation of the collapse structure emergency strengthening and retrofitting project of the damaged superstructure with revitalization of the Outeiro Bridge 1